Jobs Headed to Fabrication

7th St. Grade Separation East - Railroad Bridge

  • 2 Span DPG Bridge with 86 Beam Girders, Metallized & Galvanized. ~3,100,000 Lbs.

  • Location: Oakland, California

Juneau Creek Bridge

    • 3 Span Plate Girder Bridge with 45 Plate Girders (13’ tall x 90’ – 120’ long), Metallized, Galvanized, Painted. ~6,500,000 Lbs.

    • Location: Juneau, Alaska

Santa Rosa Rancheria Tachi Yokut Tribe (Burnell Ave)

    • Single Span Plate Girder Bridge with 5 Plate Girders (3.5’ tall x 92’ long), weathering. ~113,000 Lbs.

    • Location: Santa Rosa Rancheria Lemoore, California.

 Sandia Creek Drive Bridge Replacement

    • 3 Span Plate Girder Bridge with 24 Plate Girders (6.65’ tall x 31’ – 102’), weathering. ~1,300,000 Lbs.

    • Location: Fallbrook, California

 Vai Resort Isle 7

    • 2.5 Story Building, ~9,000 Sq. Ft, ~4,500,000 Lbs.

    • Location: Glendale, Arizona

Recent Employee Accomplishments

Quality Control Lead Inspector David Adkins has been certified by the American Welding Society, and is now a Certified Welding Inspector (CWI)

“Stinger has been a great place to work. I’ve had opportunities here that may not have been available elsewhere and the folks I work with are first rate.”

1st Quarterly Employee of the Month – Ivan Morales

“I have worked at Stinger for 5 years and I have learned so much from all my leaders and coworkers, I'm so thankful for the opportunity to learn something new to me. Stinger is a great place to work, learn and grow up.”

2nd Quarterly Employee of the Month – Nancy Harrison

“I have worked at Stinger for 10 years and have watched it grow tremendously. We have been involved in some amazing projects. The reason I love working here is because of the people that work here. We all work as a team and I couldn’t think of a more satisfying and fulfilling job.”