Colton Loma Linda Right and Left Ramp Widening consisted of 2 runs of 7' 0" tall girders with cross-brace diaphragms, 3000 LF, across 12 spans. The bridge consist of 38 girders with a total weight of 1,280,000 lbs. Stinger erected in five nights on Interstate 215 over two local roadways and railroad.